Plano de piezas de construcción capitales

Basic

Packaged volume:
0.01 m3
Portion size:
1
Capacidad:
0 m3
Volumen:
0.01 m3
Masa:
0 kg
radius:
1 m

Cargo

Capacidad:
0 m3

Manufacturing

Manufacturing time:
4h 26m 40s
ProductQuantity
Piezas de construcción capitales1
MaterialQuantity
Tritanio30,000
Pierita105,000
Mexalón30,000
Isogen9,000
Nocxium750
Zidrina413
Megacita210
Fibra de carbono reforzada100

Required Skills

Material Research

Material EfficiencyTotal time
11h 45m
24h 10m
39h 55m
423h 34m
52d 8h
65d 13h 20m
713d 4h 40m
831d 10h 15m
974d 19h
10177d 18h 40m
Basic research time, not accounting for skills and other bonuses.

Time Research

Time EfficiencyTotal time
21h 45m
44h 10m
69h 55m
823h 34m
102d 8h
125d 13h 20m
1413d 4h 40m
1631d 10h 15m
1874d 19h
20177d 18h 40m
Basic research time, not accounting for skills and other bonuses.

Copying

Copy time:
3h 33m 20s
Production limit:
40

Type Info

Type ID:
21038
Base price:
1.01b ISK
Icon ID:
2870
Published:
true
Radius:
1 m
Volume:
0.01 m3

Description