I'm giving away over 30 billion ISK

Join Giveaway »

ORE Strip Miner Blueprint

Inventory group: Blueprint > Strip Miner Blueprint

Basic

Packaged volume:
0.01 m3
Portion size:
1
Capacity:
0 m3
Volume:
0.01 m3
Mass:
0 kg
radius:
1 m

Cargo

Capacity:
0 m3

Manufacturing

Manufacturing time:
35m
ProductQuantity
ORE Strip Miner1
MaterialQuantity
Tritanium98,658
Pyerite30,613
Mexallon7,806
Nocxium744
Megacyte176

Material Research

Material EfficiencyTotal time
112m 15s
229m 10s
31h 9m 25s
42h 44m 58s
56h 32m
615h 33m 20s
71d 12h 56m 40s
83d 15h 59m 45s
98d 17h 25m
1020d 17h 46m 40s
Basic research time, not accounting for skills and other bonuses.

Time Research

Time EfficiencyTotal time
212m 15s
429m 10s
61h 9m 25s
82h 44m 58s
106h 32m
1215h 33m 20s
141d 12h 56m 40s
163d 15h 59m 45s
188d 17h 25m
2020d 17h 46m 40s
Basic research time, not accounting for skills and other bonuses.

Copying

Copy time:
28m
Production limit:
80

Type Info

Type ID:
28755
Base price:
16.13m ISK
Icon ID:
2527
Meta group ID:
4
Radius:
1 m
Volume:
0.01 m3

Description