Strip Miner I

Defenses
Structure
40 HP
Market
StationSellBuy
Jita
Amarr
Rens
Dodixie
Hek
Maila
Basic
Volume25.00 m3
Mass0.00 kg
Tech Level1.00 Level
 PublishedTrue
Cargo
Capacity0.00 m3
Fitting
CPU usage60.00 tf
Powergrid Usage10.00 MW
Activation Cost90.00 GJ
Weapon
Optimal Range15,000.00 m
Required skills
Mining[4] 
Usage
Can be fitted toMining Barge
Can be fitted toExhumer
Reprocessing
 Portion Size1.00
Output 
Tritanium12,331
Pyerite9,566
Mexallon3,903
Nocxium675
Megacyte264
Basic reprocessing, not accounting for skills and other bonuses.
Industry
Other
Activation time / duration180.00 s
 Meta Level0.00 Level
 Mining amount675.00 m3
 typeColorScheme11,346.00
Capacity0.00 m3
Mass0.00 kg
Volume25.00 m3
 targetGroup11.00
radius25.00

Description

A bulk ore extractor designed for use on Mining Barges and Exhumers.