Energy Grid Upgrades

Market
StationSellBuy
Jita
Amarr
Rens
Dodixie
Hek
Maila
Basic
Volume0.01 m3
Mass0.00 
 Base Price79,000.00 
 PublishedTrue
Skill
 Primary attribute
 Secondary attribute
Training time multiplier 2.00 
Cargo
Capacity0.00 m3
Other
CPU Need Bonus-5.00 
Level0.00
Capacity0.00 m3
Mass0.00 
Volume0.01 m3
radius1.00

Description

Skill at installing power upgrades e.g. capacitor battery and power diagnostic units. 5% reduction in CPU needs of modules requiring Energy Grid Upgrades per skill level.