Ariel Rin for CSM19

Read more »

Mining Laser Optimization Charge

Basic

Mass:
0 kg
Packaged volume:
0.01 m3
Portion size:
500
Capacity:
0 m3
Volume:
0.01 m3
Mass:
0 kg
radius:
1 m

Required Skills

(x1)
[1]
(x2)
[1]
(x1)
[1]

Reprocessing

Portion size:
500
OutputQuantity
Tritanium500
Isogen500
Heavy Water500
Basic reprocessing, not accounting for skills and other bonuses.

Manufacturing

Manufacturing time:
1h 23m 20s
Copy time:
12m
Material research:
5m 15s
Time research:
5m 15s

Type Info

Type ID:
42830
Base price:
1.00k ISK
Icon ID:
21698
Published:
true
Radius:
1 m
Volume:
0.01 m3

Description

This compact bundle of active nanites can be loaded into a Mining Foreman Burst I module and dispersed across allied ships to greatly enhance the speed of their mining modules, allowing increased yield over time. This effect also reduces the capacitor requirements of the mining laser to compensate for the faster cycle times.