Ariel Rin for CSM19

Read more »

Mining Equipment Preservation Charge Blueprint

Basic

Packaged volume:
0.01 m3
Portion size:
1

Manufacturing

Manufacturing time:
1h 23m 20s
ProductQuantity
Mining Equipment Preservation Charge500
MaterialQuantity
Tritanium500
Isogen500
Heavy Water500

Material Research

Material EfficiencyTotal time
15m 15s
212m 30s
329m 45s
41h 10m 42s
52h 48m
66h 40m
715h 50m
81d 13h 42m 45s
93d 17h 45m
108d 21h 20m
Basic research time, not accounting for skills and other bonuses.

Time Research

Time EfficiencyTotal time
25m 15s
412m 30s
629m 45s
81h 10m 42s
102h 48m
126h 40m
1415h 50m
161d 13h 42m 45s
183d 17h 45m
208d 21h 20m
Basic research time, not accounting for skills and other bonuses.

Copying

Copy time:
12m
Production limit:
200

Type Info

Type ID:
42880
Base price:
10.00m ISK
Icon ID:
21696
Published:
true
Radius:
1 m
Volume:
0.01 m3

Description