Ariel Rin for CSM19

Read more »

Standup M-Set Basic Capital Component Manufacturing Time Efficiency II

Basic

Mass:
200 kg
Packaged volume:
10 m3
Portion size:
1
Capacity:
0 m3
Volume:
10 m3
Mass:
200 kg
radius:
100 m

Rigging

Rig Size:
medium

Required Skills

(x2)
[1]
(x1)
[3]

Structure

Reprocessing

Portion size:
1
OutputQuantity
Nanite Compound20
Lorentz Fluid200
Current Pump1,200
Trigger Unit1,200
Power Conduit200
Artificial Neural Network1,000
Power Circuit16
Micro Circuit1,200
Interface Circuit28
Conductive Thermoplastic200
Basic reprocessing, not accounting for skills and other bonuses.

Manufacturing

Manufacturing time:
8h 20m
Copy time:
6h 40m
Material research:
2h 55m
Time research:
2h 55m

Type Info

Type ID:
43873
Icon ID:
21729
Meta group ID:
53
Published:
true
Radius:
100 m
Volume:
10 m3

Description

The Standup M-Set Basic Capital Component Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements when manufacturing capital ship construction components in their Upwell structures. Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology. Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.