Welcome to the new EVE Ref

Support on Patreon »

Standup M-Set Moon Drilling Efficiency II

Basic

Mass:
200 kg
Packaged volume:
10 m3
Portion size:
1
Capacity:
0 m3
Volume:
10 m3
Mass:
200 kg
radius:
100 m

Cargo

Capacity:
0 m3

Rigging

Rig Size:
medium

Required Skills

(x2)
[1]
(x1)
[3]

Structure

Reprocessing

Portion size:
1
OutputQuantity
Intact Shield Emitter16
Nanite Compound28
Lorentz Fluid1,200
Power Conduit760
Artificial Neural Network1,200
Power Circuit760
Logic Circuit28
Interface Circuit760
Capacitor Console28
Enhanced Ward Console16
Basic reprocessing, not accounting for skills and other bonuses.

Type Info

Type ID:
46324
Icon ID:
21787
Meta group ID:
53
Published:
true
Radius:
100 m
Volume:
10 m3

Description

The Standup M-Set Moon Drilling Efficiency II rig provides a means for structure operators to increase the yield over time of the moon drilling operations in their Upwell Refinery structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.