铁壁蓝图
Market
Basic
- Packaged volume:
- 0.01 m3
- Portion size:
- 1
Manufacturing
- Manufacturing time:
- 19d 16h 13m 20s
| Product | Quantity |
|---|---|
| 铁壁 | 1 |
| Material | Quantity |
|---|---|
| 建筑建造组件 | 10 |
| 建筑机库阵列 | 10 |
| 建筑贮藏舱 | 10 |
| 建筑实验室 | 4 |
| 建筑工厂 | 4 |
| 建筑维修设施 | 10 |
| 建筑提炼工厂 | 4 |
| 建筑停泊港 | 10 |
| 建筑市场网络 | 40 |
| 建筑医疗中心 | 10 |
| 建筑办公室中心 | 10 |
| 建筑宣传节点 | 4 |
Required Skills
Material Research
| Material Efficiency | Total time |
|---|---|
| 1 | 17h 13m 20s |
| 2 | 1d 17h 19.047s |
| 3 | 4d 1h 35m 33.333s |
| 4 | 9d 15h 55m 33.333s |
| 5 | 22d 23h 6m 40s |
| 6 | 54d 16h 10m 9.523s |
| 7 | 129d 20h 24m 7.619s |
| 8 | 309d 6h 46m 40s |
| 9 | 736d 1h 4m 45.714s |
| 10 | 1749d 13h 25m 4.761s |
Basic research time, not accounting for skills and other bonuses.
Time Research
| Time Efficiency | Total time |
|---|---|
| 2 | 17h 13m 20s |
| 4 | 1d 17h 19.047s |
| 6 | 4d 1h 35m 33.333s |
| 8 | 9d 15h 55m 33.333s |
| 10 | 22d 23h 6m 40s |
| 12 | 54d 16h 10m 9.523s |
| 14 | 129d 20h 24m 7.619s |
| 16 | 309d 6h 46m 40s |
| 18 | 736d 1h 4m 45.714s |
| 20 | 1749d 13h 25m 4.761s |
Basic research time, not accounting for skills and other bonuses.
Copying
- Copy time:
- 15d 23h 20m
- Production limit:
- 1