塔塔拉蓝图
Market
Basic
- Packaged volume:
- 0.01 m3
- Portion size:
- 1
Manufacturing
- Manufacturing time:
- 15d 1h 6m 40s
| Product | Quantity |
|---|---|
| 塔塔拉 | 1 |
| Material | Quantity |
|---|---|
| 建筑建造组件 | 8 |
| 建筑机库阵列 | 4 |
| 建筑贮藏舱 | 20 |
| 建筑实验室 | 2 |
| 建筑工厂 | 2 |
| 建筑维修设施 | 4 |
| 建筑提炼工厂 | 24 |
| 建筑停泊港 | 4 |
| 建筑市场网络 | 4 |
| 建筑医疗中心 | 2 |
| 建筑办公室中心 | 4 |
| 建筑磁力感应器 | 6 |
| 建筑加速线圈 | 6 |
| 建筑宣传节点 | 2 |
Required Skills
Material Research
| Material Efficiency | Total time |
|---|---|
| 1 | 13h 53m 20s |
| 2 | 1d 9h 4m 7.619s |
| 3 | 3d 6h 42m 13.333s |
| 4 | 7d 19h 2m 13.333s |
| 5 | 18d 12h 26m 40s |
| 6 | 44d 2h 12m 3.809s |
| 7 | 104d 17h 13m 39.047s |
| 8 | 249d 10h 6m 40s |
| 9 | 593d 14h 1m 54.285s |
| 10 | 1410d 22h 26m 1.904s |
Basic research time, not accounting for skills and other bonuses.
Time Research
| Time Efficiency | Total time |
|---|---|
| 2 | 13h 53m 20s |
| 4 | 1d 9h 4m 7.619s |
| 6 | 3d 6h 42m 13.333s |
| 8 | 7d 19h 2m 13.333s |
| 10 | 18d 12h 26m 40s |
| 12 | 44d 2h 12m 3.809s |
| 14 | 104d 17h 13m 39.047s |
| 16 | 249d 10h 6m 40s |
| 18 | 593d 14h 1m 54.285s |
| 20 | 1410d 22h 26m 1.904s |
Basic research time, not accounting for skills and other bonuses.
Copying
- Copy time:
- 11d 13h 46m 40s
- Production limit:
- 1