大型工业核心蓝图 II
Basic
- Packaged volume:
- 0.01 m3
- Portion size:
- 1
Produced from
- Blueprint invention:
- 大型工业核心蓝图 I
Manufacturing
- Manufacturing time:
- 1d 5h 15m
| Product | Quantity |
|---|---|
| 大型工业核心 II | 1 |
| Material | Quantity |
|---|---|
| 水冷CPU | 500 |
| 微型电子元件 | 250 |
| 莫尔石 | 500 |
| R.A.M. - 电子元件 | 500 |
| 量子微处理器 | 250 |
| 强化碳纤维 | 500 |
| 大型工业核心 I | 1 |
Required Skills
Material Research
| Material Efficiency | Total time |
|---|---|
| 1 | 10h 14m 15s |
| 2 | 1d 22m 30s |
| 3 | 2d 10h 45s |
| 4 | 5d 17h 51m 54s |
| 5 | 13d 15h 36m |
| 6 | 32d 12h |
| 7 | 77d 4h 30m |
| 8 | 183d 20h 21m 45s |
| 9 | 437d 12h 45m |
| 10 | 1040d |
Basic research time, not accounting for skills and other bonuses.
Time Research
| Time Efficiency | Total time |
|---|---|
| 2 | 10h 14m 15s |
| 4 | 1d 22m 30s |
| 6 | 2d 10h 45s |
| 8 | 5d 17h 51m 54s |
| 10 | 13d 15h 36m |
| 12 | 32d 12h |
| 14 | 77d 4h 30m |
| 16 | 183d 20h 21m 45s |
| 18 | 437d 12h 45m |
| 20 | 1040d |
Basic research time, not accounting for skills and other bonuses.
Copying
- Copy time:
- 23h 24m
- Production limit:
- 10