Standup M-Set TE Research Cost Optimization I

Defenses
Structure
40 HP
Market
StationSellBuy
Jita
Amarr
Rens
Dodixie
Hek
Maila
Basic
 Type ID43887
 PublishedTrue
Tech Level1
Volume10.00 m3
Volume10.00 m3
Mass200.00 kg
Mass200.00 kg
Radius100.00
radius100.00
Module
Max Modules Of This Group Allowed1.00
Variations
Structure Tech II
Tech I
  • Standup M-Set TE Research Cost Optimization I
Cargo
Capacity0.00 m3
Fitting
 Rig Sizemedium
Required skills
Usage
Can be fitted toCitadel
Can be fitted toEngineering Complex
Can be fitted toRefinery
Other
 Cost Reduction Bonus-10.00 %
 Material Reduction Bonus0.00 %
 Time Reduction Bonus0.00 %
 High Security Bonus Multiplier1.00 x
 Low Security Bonus Multiplier1.90 x
 Nullsec and Wormhole Bonus Multiplier2.10 x
 securityModifier1.00
 Calibration cost100.00
 structureItemVisualFlag1.00
Capacity0.00 m3

Description

The Standup M-Set TE Research Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing time efficiency research in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.