Ariel Rin for CSM19

Read more »

Metenox Moon Drill

Basic

Mass:
3,000,000,000 kg
Packaged volume:
6,000 m3
Portion size:
1
Structure Hitpoints:
24,000,000 HP
Capacity:
0 m3
Volume:
6,000 m3
Mass:
3,000,000,000 kg
radius:
25,000 m

Rigging

Reprocessing

Portion size:
1
OutputQuantity
Structure Construction Parts3
Structure Storage Bay1
Structure Reprocessing Plant1
Structure Office Center1
Basic reprocessing, not accounting for skills and other bonuses.

Manufacturing

Manufacturing time:
8d 16h 20m
Copy time:
6d 22h 40m
Material research:
13h 53m 20s
Time research:
13h 53m 20s

Type Info

Type ID:
81826
Graphic ID:
27379
Icon ID:
26065
Market group ID:
Mining Structures
Published:
true
Radius:
25,000 m
Sof faction name:
upwell-refinery
Volume:
6,000 m3

Description

The Upwell Consortium, renowned for its successful Athanor and Tatara class refineries, recognized the mounting challenges faced by its customers with moon-mining operations. In response, they unveiled the Metenox moon drill, a hands-off deployable employing traditional surface-grazing techniques. Although these autonomous facilities are less efficient at material extraction than refineries and are more vulnerable to raids due to lighter plating, short reinforcement windows, and also garner high power demands requiring colony reagents, the Consortium insists that their autonomous functionality is a worthy trade-off. Please note: The Metenox moon drill must be positioned within 250km of an eligible moon mining site and exclusively in systems rated 0.4 security or lower.