Placeholder Sov Hub Upgrade 2
Inventory group: Infrastructure Upgrades > Sovereignty Hub Site Detection Upgrades
Basic
- Mass:
- 1,000 kg
- Packaged volume:
- 20,000 m3
- Portion size:
- 1
Produced from
- Blueprint manufacturing:
- Placeholder Sov Hub Upgrade 2 Blueprint
Engineering Rig
- Source rigs (manufacturing):
Reprocessing
- Portion size:
- 1
Basic reprocessing, not accounting for skills and other bonuses.
Industry
- Not used in any blueprints
- Adam4Eve Material Influence
Type Info
- Type ID:
- 82494
- Base price:
- 50.00m ISK
- Icon ID:
- 3951
- Radius:
- 1 m
- Volume:
- 20,000 m3